Projects

Recent loads, straight from the yard.

A look at steel we have prepared, sprayed and shipped for warehouses, industrial units and commercial frames around the UK — all handled by our own crews.

Featured work

Flagship intumescent projects

White intumescent-coated steel columns lined up in the SSL spray facility
7,000 m² · Jotun Steelmaster 60SB & 1200HPE

E SCRAP

A 7,000 m² project completed with Jotun Steelmaster 60SB and 1200HPE epoxy intumescent coatings in our climate-controlled facility. A dedicated 30°C spraying space and 45°C climate-controlled storage keep every coat within specification, and our hot-spray and plural-component crews deliver a consistent, fire-rated finish across the full load.

Graco XM70 plural-component spray unit used for epoxy intumescent application
3,900 m² · 120-minute fire protection

COLT Data Centre

One of our flagship projects: Jotun Steelmaster 1200HPE epoxy intumescent applied across 3,900 m², providing 120 minutes of fire protection while keeping the steelwork's finish clean. Hot-spray and plural-component techniques, climate-controlled storage and spraying, and close coordination with the fabricator kept a large-scale programme on schedule.

Climate-controlled storage container keeping coating materials at specification temperature
30°C spray shop · 45°C material storage

Climate-Controlled Facilities

Every project runs through our controlled environment: materials held at 45°C in specialist storage and applied in a 30°C climate-controlled spray shop, so each coat cures exactly to the manufacturer's specification — whatever the weather outside.

Gallery

More from the yard

Containment & Sheeting
Case 01
Containment & Sheeting
Full enclosure setup for controlled asbestos removal.
Structural Steel Coating
Case 02
Structural Steel Coating
Primed steelwork prepared for intumescent fire protection.
On-Site Steel Frame
Case 03
On-Site Steel Frame
Fire-rated coating applied to structural frame trackside.
External Stair Cores
Case 04
External Stair Cores
Galvanised escape stairs installed on a live residential build.
Galvanised Frames Delivered
Case 05
Galvanised Frames Delivered
Fabricated balcony frames arriving to site ready for install.
Coated Steel Delivery
Case 06
Coated Steel Delivery
White-coated fire-protected beams delivered to project.
Interior Protection
Case 07
Interior Protection
Sheeting and masking prior to intumescent spray works.